Contact
Metropolitan St. Louis Sewer District
- Michael Stewart, Project Engineer, (314) 768-2784
- David L. Frierdich, Assistant Engineer, (314) 768-6385
- Brian L. Hoelscher, P.E., Director of Engineering
tel: (314) 768-6377 fax: (314) 768-6341 blhoel@stlmsd.com
WWTP Design Team ConsultantsWWTP Construction Managers
- Jacobs/Sverdrup Civil Inc.
- Kwame Building Group, Inc.
Conveyance System Design Consultants
Conveyance System Construction Managers
- Shannon & Wilson, Inc.
- Black & Veatch
General Contractors For
- Site Preparation (95066E)
- J.H. Berra Construction Co., Inc.
- Site Preloading (95066D)
- J.H. Berra Construction Co., Inc.
- Outfall Sewer (95066M)
- Bates Utility Company, Inc.
- Wastewater Treatment Plant (95066A)
- Goodwin Brothers Construction Company
- Baumgartner Tunnel (95066B)
- Lift Station (95066L)
- Mattese Creek Sewer (95066R)
- Bates Utility Company, Inc.
|