MSD Masthead Search Contact Us Job Opportunities Outreach Customer Service Programs & Projects About MSD Home Home
CIRP 2006 Infrastructure Construction Projects
The projects described in this section are related to constructing, rehabilitating or maintenance repair of sanitary or combined sewers, improvements to existing treatment plants, and the reduction of inflow and infiltration in the separate sewer area.  These types of projects help alleviate basement backups, address regulatory issues and rebuild part of our decaying infrastructure system.  Also included is the continued funding of the construction of projects related to the Lower Meramec Treatment Plant and the continued funding of a program to eliminate basement backups.  Fifty-one (51) projects are to be funded at a total estimated cost of $182,620,000.

The District's revenue source for constructing the majority of these projects is obtained from the Sanitary Replacement Fund, which receives money from wastewater user charges and from the sale of revenue bonds. The remaining projects will be funded with revenues from various Operation, Maintenance, Construction, and Improvement (OMCI) Funds, Construction Funds, Special Funds, or the Improvement Fund. The property taxes collected within the boundaries of the OMCI Taxing Districts must be spent for improvements within their specific areas of collections. The Construction Fund and Improvement Fund receive revenues from various connection fees.

PROJECT NUMBER
PROJECT NAME
COST ESTIMATE
2002044B BISSELL POINT WWTP BELT FILTER PRESS IMPROVEMENTS PHASE III(INSTALLATION)
$350,000
2002044A BISSELL POINT WWTP BELT FILTER PRESS IMPROVEMENTS PHASE II(STRUCTURAL MODIFICATIONS)
$300,000
2003058 BOENKER SANITARY RELIEF (SKME-007)
$535,000
2000065 CARR STREET PUMP STATION & FORCE MAIN REPLACEMENT (P-108)
$600,000
2005124 CASTLE OAKS SANITARY SEWER
$280,000
89130 CC-11 AND CC-20 CREVE COEUR CREEK SANITARY RELIEF
$3,200,000
90012 CC-18 SMITH CREEK BRANCH SANITARY RELIEF (SKME-028)
$2,000,000
90015A CC-22 SCHOETTLER/CLAYTON TO HWY 40 SANITARY REPLACEMENT PHASE II
$800,000
2003103 CLIFTON HEIGHTS COMBINED SEWER RELIEF
$1,700,000
99077 COLDWATER TREATMENT PLANT IMPROVEMENTS
$51,000,000
2003062 CREVE COEUR CREEK (L-52) PUMP STATION IMPROVEMENTS
$12,000,000
2005103 CSO-CLAYTON RD AND HADDINGTON CT CSO INTERCEPTOR (I-94)/OUTFALL
$150,000
2003146 CSO-GREENBRIAR COMBINED SEWER SEPARATION
$360,000
2003053A CSO-INTERCEPTOR & OUTFALL MODIFICATIONS (LM-143,BP-003,BP-006,BP-019,BP-030,BP-037,BP-043)
$4,000,000
2003054A CSO-INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS
$400,000
2003054B CSO-INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS PHASE II
$3,600,000
2005149 CSO-LARGE DIAMETER SEWER FLOWMETERS
$400,000
2005148 CSO-SMALL DIAMETER SEWER FLOWMETERS
$400,000
2003145 CSO-WAVERTON AND MAGNOLIA CSO INTERCEPTOR (I-179) ELIMINATION
$890,000
2001049 EVA-WABASH SANITARY RELIEF PHASE I
$2,100,000
2005125 FENTON WASTEWATER TREATMENT PLANT PROCESS AIR PIPING REPLACEMENT
$75,000
88088A FF-02 FEE FEE -ALAN SHEPHARD I-270 SANITARY RELIEF
$1,300,000
89137 FF-08 FEE FEE CREEK SANITARY RELIEF
$4,450,000
89155A FF-13 WALTZ RD/MCKELVEY SANITARY RELIEF PHASE II
$500,000
90022D FISHPOT EAST SANITARY RELIEF PHASE IV
$1,800,000
2003056 FROST-MIDWOOD SANITARY RELIEF
$2,200,000
2003061 GRAND GLAIZE WWTP IMPROVEMENTS
$29,000,000
2003049 HARLEM-BADEN RELIEF PHASE V (GOODFELLOWS AND STRATFORD)
$150,000
2003050 HARLEM-BADEN RELIEF PHASE V (THEODORE/ASHBY AND CORA/MARCUS)
$650,000
93077C1 INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE IV, SECTION B
$3,400,000
2005118 INFRASTRUCTURE REPAIRS (OPERATIONS-FY2006)
$2,400,000
2005119 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2006)
$5,000,000
2003078 LEMAY PUMP STATION NO.3 AND FORCE MAIN IMPROVEMENTS
$11,000,000
2005092 LEMAY WWTP STORMWATER OUTFALL CONSOLIDATION
$285,000
2001072A LINDENWOOD SEWER SYSTEM RELIEF PHASE II
$400,000
2005120 MACKLIND PUMP STATION IMPROVEMENT
$65,000
90060 MC-01 WEBSTER AND MARLBOROUGH TRUNK SANITARY RELIEF
$6,450,000
99076B MISSOURI RIVER TREATMENT PLANT IMPROVEMENTS PHASE I(REHABILITATION)
$5,500,000
2000045 NORTH PRICE TO PENNELL SANITARY REPLACEMENT
$1,330,000
89185 OLD MILL CREEK SEWER REHABILITATION PHASE I- RANKEN TO 21ST STREET
$5,500,000
2003074 REAV-TEL SANITARY RELIEF
$1,000,000
2003081A SEPARATE SEWER AREA - INFLOW/INFILTRATION REDUCTION PROJECTS (EVA WABASH REHABILITATION)
$2,400,000
2005091 SEWER IMPROVEMENTS IN ST. LOUIS CITY PARKS PHASE III
$660,000
2003097A SOUTHERN ARSENAL ORS INTERCEPTOR IMPROVEMENTS (I-203A, I-205, I-206,I-208, I-209, I-210,I-211 , I-212)
$250,000
2003097B SOUTHERN ARSENAL ORS INTERCEPTOR IMPROVEMENTS (PRESIDENT STREET AT FLOODWALL SEWER IMPROVEMENT)
$100,000
2003097C SOUTHERN ARSENAL ORS INTERCEPTOR IMPROVEMENTS (TEXAS SEWER REHABILITATION)
$350,000
2003037 SPRING GARDEN-BANFF TO RIVERVIEW SANITARY RELIEF
$1,240,000
2003088 TOWER GROVE-MANCHESTER COMBINED SEWER SYSTEM PHASE I
$1,000,000
90080A UPPER MALINE TRUNK SANITARY RELIEF PHASE III SECTION A
$5,400,000
2000046 WILLIAMS CREEK SANITARY INTERCEPTOR
$3,700,000
TOTAL
$182,620,000

Posted 08/05 

BisellPtWwtpBeltFiltPressImpPhase2-strmod
CC-18SmithCreekbranchSanitaryRelief
CC-11nCC20CreveCourCreekSanitRel
CastleOaksSanitSewer
cc-22SchoettlerClayton-HWY40SanitRepPhaseII
coldwaterTreatPlantImp
CliftonHtsCombRelief
BoenkerSanitRelief
CarrStpumpStnForceMainRepl
CSO-ClaytonrdAndHaddingtoncsoInterOutfall
CrevecouerCreek-L-52-PumpStImprovements
CSO-GreenbriarCombinedSewerSeparation
CSO-LargeDiameterSewerFlowmeters
CSO-InterceptorAccessNMonitImp
CSO-InterAccessandMonitImpPhaseII
GrandGlaizeWwtpImprovements
FishpotEastSanitaryReliefPhaseIV
FF-13WaltzRdMckelveySanitReliefPhaseII
FentonWastewaterTreatPlantProcAirPipingRep
CSO-WavertonNMagnoliaCSOInter-elim
EVA-WabashSanitaryReliefPhaseI
FF-08feefeecreeksanitaryrelief
CSO-SmallDiameterSewerFlowmeters
FrostMidwoodSanitaryRelief
FF-02FeeFeeAlanShepSanitReliefPhaseIV
LemayPumpStationNo3nForcemainimprove
harlemBadenReliefPhaseV-goodfellow-stratford
LindenwoodSewerSystemReliefPhaseII
InfraRepairs-OperationsFY2006
InfraRepair087PCaulksCrkAPhaseIVSect-B
LemayWwtpStormwaterOutfallConsolidation
InfraRepairs-RehabFY2006
HarlemBadenRelPhaseV-Thedore-AshbyCoraMarcus
MacklindpumpStImprovement
MC-01WebsterandMarlboroughtrunkSanitrelief
Reav-TelSanitaryRelief
MOriverTreatplantimpPhaseI-rehab
SewerimprovementsinStLCityPasksPhaseIII
SepSewArea-inflowInfilReducProj-EvaWabashRehab
OldmillCreekSewerRehabPhaseI-Ranken-21st
SouthernArsenalORSInterImprovements
NorthPricetoPennellSanitaryReplacement
SouthArsORSInterImp-TexasSewRehab
SpringGarden-BanffTOriverviewSanitaryRel
TowerGrove-ManchesterCombinesSewSysPhaseI
SouthArsORSInterImp-PresidentStAtFloodwall
WilliamsCreekSanitaryInter
UpperMalineTrunkSanitRelPhaseIIISectionA
BissellPtWwtpBeltFilterPressImpPhase3-inst