CIRP 2005 Infrastructure Engineering Projects
The projects described in this section relate to the preliminary or final design of a new sanitary and combined sewer outfall sewers.  Also included in this section are projects relating to construction phase services and engineering construction services for various treatment plants, wetlands mitigation for the improvements at the Missouri River Treatment Plant, an update of the Combined Sewer Overflow Long Term Control Plan, separate sewer area inflow/infiltration assessments, combined and separate sewer area flow metering and monitoring and CCTV inspections and physical inspection of sewers, and additional funding for the District's basement backup elimination program.  The construction phase of the preliminary and final design projects are planned in later fiscal years due to the complexity of the design, the size of the project or time required to obtain needed easements.

Fifty-eight (58) infrastructure engineering projects are planned at a total estimated cost of $52,635,000. The cost estimates indicated are for only the engineering work, however, the project scopes are fully described.

PROJECT NAME COST ESTIMATE
ARGONNE SANITARY RELIEF (SKME-501) (DESIGN) $1,700,000
BELLEFONTAINE #1 LATERAL SANITARY RELIEF (SKME-315) (DESIGN) $350,000
BELLSWORTH TO TELEGRAPH SEPARATE SEWER AREA I/I REDUCTION (DESIGN) $255,000
BLACKSTONE-CLARENDON COMBINED SEWER SYSTEM (DESIGN) $1,000,000
BOENKER SANITARY RELIEF (SKME-007) (DESIGN) $105,000
BROOKTON WAY TO MEREMAC BOTTOM ROAD SANITARY RELIEF (DESIGN) $780,000
CC-08 ISLEVIEW DR AND WOODSBLUFF SANITARY RELIEF (DESIGN) $220,000
CC-13 CREVE COEUR CREEK SANITARY RELIEF (DESIGN) $190,000
CC-14 CREVE COEUR CREEK SANITARY RELIEF (SKME-026) (DESIGN) $650,000
CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (SUPPLEMENTAL APPROPRIATION) $2,000,000
CHAMBERS - SOUTH BENTON COMBINED SEWER SYSTEM (PRELIMINARY DESIGN) $500,000
CLIFTON HEIGHTS COMBINED SEWER RELIEF (DESIGN) $245,000
COLDWATER TREATMENT PLANT IMPROVEMENTS - ENGINEERING CONSTRUCTION SERVICES $1,200,000
COMBINED SEWER AREA - FLOW METERING AND MONITORING (SUPPLEMENTAL APPROPRIATION) $2,000,000
COMBINED SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (SUPPLEMENTAL APPROPRIATION) $2,000,000
COMBINED SEWER AREA OVERFLOW LONG TERM CONTROL PLAN UPDATE (SUPPLEMENTAL APPROPRIATION) $250,000
CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE I (DESIGN) $1,000,000
CSO - DROMARA DRIVE SEWER SEPARATION (DESIGN) $80,000
CSO - IN-LINE FLOW MANAGEMENT AND OUTFALL TREATMENT ANALYSIS (SUPPLEMENTAL APPROPRIATION) $500,000
CSO - INTERCEPTOR & OUTFALL MODIFICATIONS (DESIGN) $2,530,000
CSO - INTERCEPTOR & OUTFALL PERFORMANCE ASSESSMENT (SUPPLEMENTAL APPROPRIATION) $600,000
CSO - INTERCEPTOR ACCESS AND MONITORING IMPROVEMENT STUDY (SUPPLEMENTAL APPROPRIATION) $600,000
CSO - INTERCEPTOR ACCESS AND MONITORING IMPROVEMENTS (DESIGN) $1,000,000
CSO - RIVERVIEW NORTH SEWER SEPARATION/ELIMINATION (DESIGN) $300,000
CSO - WAVERTON AND MAGNOLIA CSO INTERCEPTOR (I-179) ELIMINATION (DESIGN) $195,000
DAKOTA COMBINED SEWER SYSTEM (PRELIMINARY DESIGN) $400,000
DC-02 DEER CREEK SANITARY RELIEF (PRELIMINARY DESIGN) $900,000
EASTERN ROCKY BRANCH COMBINED SEWER SYSTEM (DESIGN) $1,000,000
FF-18 VILLADORADO - LACKLAND - PAGE SANITARY RELIEF (SKME-015) (DESIGN) $500,000
FORESTWOOD LATERAL SANITARY RELIEF (SKME-321) (DESIGN) $610,000
GLAISE AND ROCK CREEK COMBINED SEWER RELIEF (PRELIMINARY DESIGN) $1,900,000
GOETHE, MILENTZ AND HOLLY HILLS COMBINED SEWER RELIEF (DESIGN) $580,000
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE II (DESIGN) $510,000
HALEM - BADEN RELIEF TUNNEL (PRELIMINARY DESIGN) $2,500,000
INFRASTRUCTURE REPAIR #087P CAULKS CREEK "A" (P-750) PHASE IV, SECTION B (LAND ACQUISITION) $800,000
LEMAY GARDENS SEPARATE SEWER AREA I/I REDUCTION (DESIGN) $150,000
LOUISA COMBINED SEWER SYSTEM (PRELIMINARY DESIGN) $425,000
LOWER MERAMEC RIVER WWTP CONSTRUCTION PHASE SERVICES - BAUMGARTNER (SUPPLEMENTAL APPROPRIATION) $2,000,000
LOWER MERAMEC RIVER WWTP CONSTRUCTION PHASE SERVICES - WWTP (SUPPLEMENTAL APPROPRIATION) $2,000,000
LOWER MERAMEC RIVER WWTP ENGINEERING CONSTRUCTION SERVICES (SUPPLEMENTAL APPROPRIATION) $750,000
LOWER MERAMEC RIVER WWTP ENGINEERING CONSTRUCTION SERVICES - BAUMGARTNER (SUPPLEMENTAL APPROPRIATION) $500,000
MISSOURI RIVER TREATMENT PLANT IMPROVEMENTS (WETLANDS MITIGATION) $750,000
NORTHLAND LATERAL SANITARY RELIEF (SKME-310) (DESIGN) $265,000
OAK DRIVE TO BOPP LANE SANITARY RELIEF PAHSE II (LAND ACQUISITION) $350,000
ORCHARD LANE TO GEYER ROAD SANITARY RELIEF (DESIGN) $185,000
RADAR RAINFALL DATA (SUPPLEMENTAL APPROPRIATION) $120,000
SCHOETTLER SANITARY RELIEF (SKME-018) (DESIGN) $370,000
SEPARATE SEWER AREA - INFLOW/INFILTRATION ASSESSMENT (SUPPLEMENTAL APPROPRIATION) $1,500,000
SEPARATE SEWER AREA - FLOW METERING AND MONITORING (SUPPLEMENTAL APPROPRIATION) $4,000,000
SOUTHERN ARSENAL ORS INTERCEPTOR IMPROVEMENTS (DESIGN) $325,000
TOWER GROVE-MANCHESTER COMBINED SEWER SYSTEM (DESIGN) $2,000,000
TREATMENT PLANT CONSTRUCTION PHASE SERVICES (COLDWATER AND LEMAY) $1,650,000
TREATMENT PLANT CONSTRUCTION PHASE SERVICES (GRAND GLAIZE AND MISSOURI RIVER) $190,000
UR-03 RIVER DES PERES SANITARY RELIEF PHASE II (DESIGN) $700,000
WATERSHED FACILITY PLANNING (SUPPLEMENTAL APPROPRIATION) $2,500,000
WEAVER AVENUE SANITARY RELIEF SEWER (DESIGN) $160,000
WESTERN ROCKY BRANCH SEWER SYSTEM (DESIGN) $1,400,000
WIEGEL LATERAL SANITARY RELIEF (SKME-313) (DESIGN) $395,000

TOTAL

$52,635,000
Posted 07/04
Bellefontaine
BellsworthtoTelegraph
Blackstone-Clarendon
BrooktonWaytoMeremacBottom
CC-08Isleview
CC-13CreveCoeur
CC-14CreveCoeur
CCTVInspection
CSO-Dromara
CSOInLine
CSOInterceptorAccessandMonitoring
CSOInterceptorAccessandMonitoringDesign
CSOInterceptorOutfall
CSOInterceptorOutfallPerformance
CSORiverviewNorth
CSOWavertonMagnolia
ChambersSouthBenton
CliftonHeights
ColdwaterTreatmentPlant
CombinedSewerAreaFlowMetering
CombinedSewerOverflow
CombinedSewereAreaInflow
CreveCoeurCreek
DC-02DeerCreek
DakotaCombined
EasternRockyBranch
FF-18Villadorado
ForestwoodLateral
GlaiseAndRockCreek
GoetheMilentz
GravoisTrunk
HarlemBaden
InfraStructureRepair
LemayGardens
LouisaCombined
LowerMeramecRiverWWTPBaumgartner
LowerMeramecRiverWWTPConstServ
LowerMeramecRiverWWTPEngConstServ
LowerMeramecRiverWWTPEngConstServBaum
MissouriRiverTreatmentPlant
NorthlandLateral
OakDrivetoBoppLane
OrchardLanetoGeyer
RadarRainfallData
SchoettlerSanitaryRelief
SeparateSewerAreaFlowMetering
SeparateSewerAreaInflow
SouthernArsenalOrsInterceptor
TowerGroveManchester
TreatmentPlantConstructionColdwater
TreatmentPlantConstructionGrandGlaize
UR03RiverDesPeres
WatershedFacility
WeaverAve
WesternRocky
WiegelLateral
boenker
Argonne